Design of buildings
Location:
Principal:AUTOKONSZERN Co. Ltd.
Year:1991
Revenue:
- Assembly hall (ground floor):
Covered area: 36 468 m2
- Head building (ground floor +1 floor):
Covered area: 2 875 m2
- Kitchen building:
Covered area: 886 m2
- Architecture
- Structural engineering
- Mechanical engineering
- Electrical engineering
- Telecommunication
- Land survey
- Soil mechanics
The main building of the factory is divided into two basic parts:
- multi-aisle factory hall
- two-level head building row
The factory hall is divided into four functional parts:
- stamping plant
- welding plant
- finishing plant
- assembly plant
Having prepared the study of site selection, UVATERV Ltd. prepared the design for approval of the facility according to the requirements of the Japanese car assembly technology.